Supply of Flood Warning scheme for Perth, March 2008 -ongoing
Hydro-Logic was appointed by Perth and Kinross council via Halcrow Consulting Engineers to supply install and maintain 10 no. monitoring sites. These sites were spread over Perth City primarily to monitor the levels in a number of small burns that pass through the centre of Perth. The burns historically can cause severe flooding and their monitoring was deemed essential as part of the cities overall flood prevention scheme.
Morgan Est Contractors for National Grid
Supply and installation of telemetred groundwater monitoring network, May 2006 - ongoing
Supply of a network of groundwater quality telemetry loggers for providing warning of high turbidity for public supply wells for the protection of several Public Supply abstraction wells near Croydon, South London. The network of 14 systems were located on observation boreholes drilled into the chalk strata nearby to tunnelling operations undertaken by the client for a major construction project for a cable tunnel for National Grid. The work included provision of roadside enclosures for housing instrumentation and automatic low-flow purge sampling equipment installed in each borehole.


