Hydro-Logic Consultants

  • Increase font size
  • Default font size
  • Decrease font size

Case Studies


Tenbury Floods Project

 

Client:- Malvern Hills District Council

Project:- Tenbury Wells property level flood alleviation surveys

Hydro-Logic was appointed by the Tenbury Flood Task Group (TFTG) in 2010, to survey flood risk properties in Tenbury and identify suitable flood-protection measures. The project was designed in line with the DEFRA 'property-level' flood alleviation scheme.

Download PDF for further information...

© Hydro-Logic Ltd 2011
    |     Home     |     About Us     |     News     |     Terms and Conditions     |